Parse error: syntax error, unexpected end of file, expecting ',' or ';' in /homepages/24/d89524919/htdocs/wpweth/wp-content/themes/townpress/functions.php(291) : runtime-created function on line 1

Temporary Traffic Regulation Order of Finchingfield Road – Howe Street to Dyer’s End: 25th October 2018

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Finchingfield Road – Howe Street To Dyer’s End – Zc161, Howe Street, Upper Howe Street, Finchingfield

Please click on the following link:  https://roadworks.org/?tm=106694767 to find details of the intended closure of Finchingfield Road – Howe Street To Dyer’s End – Zc161, Howe Street, Upper Howe Street, due to commence on 25th October 2018 for 29 days. The closure is required for the safety of the public and workforce while Gigaclear Limited undertakes fibre optic cable installation works.

SEVERE WEATHER WARNING: 14.00 FRIDAY 20th JULY to 23.59 FRIDAY 20th JULY

MESSAGE FROM BRAINTREE DISTRICT COUNCIL:

 

Good afternoon,

 

The Met Office have issued a Severe Weather Warning For Thunderstorms for our area, this is valid from 1400 Friday 20th July until 2359 20th July. (Copy attached)

 

Up to 30mm of rainfall per hour is predicted in areas that are affected and the potential impacts of this are below:

 

  • A small chance that homes and businesses could be flooded quickly, with damage to some buildings from floodwater.

 

  • Where flooding or lightning strikes occur, there is a chance of delays and some cancellations to train and bus services, particularly during the evening rush hour.

 

  • Spray and sudden flooding that could lead to difficult driving conditions with the possibility of road closures.

 

  • A slight chance that power cuts could occur and other services to some homes and businesses could be lost.

 

In addition to the Thunderstorm Warning on Friday, the Heat-health Watch has been updated and is now at Level Two across the East of England from 0000 on Friday until 0000 on Sunday. There is a 60% chance of hot and humid conditions, with temperatures likely to reach thresholds through this period, although somewhat less hot in coastal districts.

Amended Temporary Traffic Regulation Order of Plums Lane, Bardfield Saling & Stebbing Road, Great Saling

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Plums Lane, New Green, Long Green Lane, The Street, Bardfield Saling

Please click on the following link https://roadworks.org/?tm=105631204 to find amended details of the closure of Plums Lane, New Green, Long Green Lane, The Street, which commenced on 27th June 2018 and is now estimated to be completed on 16/07/2018. The closure is required for the safety of the public and workforce while Gigaclear Limited undertakes Fibre Optic Cable Installation.

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Stebbing Road, Newpasture Lane, Great Saling

Please click on the following link https://roadworks.org/?tm=106243204 to find details of the intended closure of Stebbing Road, Newpasture Lane, due to commence on 23rd August 2018 for 43 days. The closure is required for the safety of the public and workforce while Gigaclear Limited undertakes Fibre Optic Cable Installation.

Temporary Traffic Regulation Orders: Cross Farm Rd, Finchingfield & Cross Hill, Willows Rd, Gt Bardfield

ROAD TRAFFIC REGULATION ACT 1984 – SECTION 14(1)

Temporary Traffic Regulation Order of Cross Farm Road, Finchingfield

Please click on the following link https://roadworks.org?tm=106229129<https://roadworks.org/?tm=106229129 to find details of the intended closure of Cross Farm Road, due to commence on 14th August 2018 for 16 days. The closure is required for the safety of the public and workforce while Gigaclear Limited undertakes Fibre Optic Cable Installation.

Temporary Traffic Regulation Order of Cross Hill, Willows Road, Great Bardfield

Please click on the following link https://roadworks.org?tm=106236367<https://roadworks.org/?tm=106236367 to find details of the intended closure of Cross Hill, Willows Road, due to commence on 16th August 2018 for 23 days. The closure is required for the safety of the public and workforce while Gigaclear Limited undertakes Fibre Optic Cable Installation.

Regards,

Essex Streetworks Team


Warning: call_user_func_array() expects parameter 1 to be a valid callback, no array or string given in /homepages/24/d89524919/htdocs/wpweth/wp-includes/class-wp-hook.php on line 286